Page 3 - PHII - PHIIE Owners Manual L04v0320PHIIOM
P. 3

MAINTENANCE


          Super Lube  (#SL1CC) applied to the piston rod will
                      ®
          prolong the life of the Piston Shaft Seal.  This should be
          done every spring and fall or more regularly if the head
          is used frequently.  Applying Super Lube to all moving
          parts is also recommended.
          Installtion of a Knocks Out Odor Kit (#KO2) will reduce
          the "rotten egg" smell associated with using salt or brackish   INSTALLATION OF REPLACEMENT
          water to flush the toilet.                                                   PARTS
          Before attempting   repairs,  refer  to the Troubleshooting
          section of this manual.                                   1.  Refer  to  Fig.  #2  when  replacing  part
                                                                        #1228CW.
                                                                    2.  If valve body (#1203BW) is removed it
                             WINTERIZING
          Improper winter lay up is a major cause of marine             must be positioned as in Fig. #3 for proper
                                                                        operation.
          toilet failures.
          Parts Required                                            Overhaul kits and individual parts for your
                                                                    toilet may be ordered through your dealer or
          •  3/4" I.D. intake hose approximately 3 feet long.       direct from the factory.                      MAINTENANCE\WINTERIZATION
          •  1 1/2" I.D. discharge hose approximately 3 feet long.
          •  Two buckets                                                  FIG 2
          •  Nontoxic antifreeze approximately 1 quart
          1. Close the intake and discharge seacock.  Disconnect           Toilet                 WRONG!
              and drain the intake and discharge hoses.                     Base
          2.  Connect short hoses to toilet’s intake and discharge.
          3.  Place one bucket under short hose on discharge.
                                                                                  Correct Orientation of
          4.  Pour nontoxic antifreeze in other bucket.                          #1228CW Flapper Valves
          5.  Place hose connected to intake into bucket with
              antifreeze.                                                  Toilet
          6.  Flush toilet until antifreeze begins to be discharged         Base                 CORRECT!
              from toilet.
          7.   Antifreeze  should  remain  in  the  toilet  until         FIG 3         NOTE:  Before reinstalling
                                                                                        1209BW valve handle, be
              recommissioning.  This will protect both intake and                       sure points "A" and "B"
              discharge sides of the pump.  Pouring antifreeze into                     on the inlet valve body
                                                                                        (#1203BW) are positioned
              the bowl will only protect the discharge.                                 as shown   by the double
          NOTE:  Holding  tanks, seacocks  and  treatment                               arrow.
          systems need to be independently winterized, stored
          and recommissioned (see manufacturer’s instructions).                         POINT "A"

                         RECOMMISSIONING
          1.   Lubricate piston rod with Super Lube .                                   POINT "B"
                                                  ®
          2.  Using  the  buckets,  hoses  and  a  gallon  (3.8  liters)
              of clean water, flush the antifreeze out of the toilet.
              Dispose of antifreeze properly, in accordance with
              local and federal regulations.
          3.   Reconnect the hoses and open both seacocks.
          4.  Check  all  connections  for  leaks  with  several  test
              flushes.





          L04v0320jlc                                            3
                                                              3
   1   2   3   4   5   6   7   8